Support · Stage 2 · Geometric measure A

Support Locate positions by coordinating horizontal and vertical references

Resources for the prerequisite content of this dot point: earlier-stage (or earlier sub-level) dot points in the same strand that students usually need first. Use these to fill gaps before or alongside the core lesson.

Prerequisite links are draft mappings generated from the syllabus structure (earlier stage, same strand, closest content). They are being reviewed by teachers. Spot a poor match? Tell us.

← Back to core resources

Prerequisite dot points

Recognise the need for formal units to measure lengths and distances

Stage 1 · Geometric measure B Draft mapping

No checked resources on this prerequisite dot point yet.

Select appropriate uniform informal units to measure lengths and distances

Stage 1 · Geometric measure A Draft mapping

No checked resources on this prerequisite dot point yet.

Create a path from one location to another

Stage 1 · Geometric measure B Draft mapping

No checked resources on this prerequisite dot point yet.