Support · Mathematics Standard 11–12 – Year 11 · Networks, paths and trees
Support Determine the minimum spanning tree of a network with weighted edges, using any method
Resources for the prerequisite content of this dot point: earlier-stage (or earlier sub-level) dot points in the same strand that students usually need first. Use these to fill gaps before or alongside the core lesson.
Prerequisite links are draft mappings generated from the syllabus structure (earlier stage, same strand, closest content). They are being reviewed by teachers. Spot a poor match? Tell us.
Prerequisite dot points
Explain that the terms graph and network are interchangeable
Stage 5 · Introduction to networks (Path) Draft mapping
No checked resources on this prerequisite dot point yet.
Examine real-world applications of networks such as social networks, supply chain networks and communication infrastructure, and explore other applications of networks
Stage 5 · Introduction to networks (Path) Draft mapping
No checked resources on this prerequisite dot point yet.
Describe a network as a collection of objects (nodes or vertices) interconnected by lines (edges) that can represent systems in the real world
Stage 5 · Introduction to networks (Path) Draft mapping
- Interactive toolEnrichmentMathigon: Graph TheoryUse it for: Bridges of Königsberg, Euler paths and planar graphs, interactively.