Support · Mathematics Standard 11–12 – Year 12 – Standard 2 · Critical path analysis

Support Apply critical path analysis to determine the minimum completion time for a project

Resources for the prerequisite content of this dot point: earlier-stage (or earlier sub-level) dot points in the same strand that students usually need first. Use these to fill gaps before or alongside the core lesson.

Prerequisite links are draft mappings generated from the syllabus structure (earlier stage, same strand, closest content). They are being reviewed by teachers. Spot a poor match? Tell us.

← Back to core resources

Prerequisite dot points

This dot point has no earlier-stage prerequisite in the syllabus structure (it may be the first in its strand).